Construction of the Highway

Construction of the Highway

Construction of the Highway (from the Western Gate to the Chortut neighborhood with a total length of 4.2 km) and construction of a two-level road section with a length of 0.6 km, including the construction of one bridge over the Great Gissar Canal, one overpass above the railway, and a two-level section in the Chortut neighborhood."

Key Project Specifications:

  • Number of traffic lanes: 8

  • Total road length: 4.2 km

  • Total road surface area: 104,900 m²

  • Length of pedestrian sidewalks: 9.3 km

  • Reinforced concrete drainage channels: 10.0 km

  • Landscaped area: 23,680 m²

  • Tree planting: 2,000 trees (5-year-old chestnut)

  • Traffic signs and safety elements: 250 units

  • Lighting: 264 poles, 814 lamps

  • Sewerage pipes: 4.2 km

  • Drinking water pipes: 4.2 km (fiberglass)

  • Telecommunication lines: 5.35 km

  • High-voltage power lines: 4.86 km

  • Public transport stops: 6