Main/History
History
History
Tajik installation department "Gidroelektromontaj" (TID GEM) was founded in Dushanbe in 1959
- In 60s, TMU GEM was entrusted with electrical installation works at Yavanskaya TPP. TGEM specialists carried out the Transformers installation at 220 kV switchyard, as well as the main generator hall power unit installation works.
- In 1972, a workshop for metal working and fabrication was launched.
- From 1972 to 1979, all electrical works were completed and the turbogenerator units of Nurek HPP were commissioned. The electrical part installation was carried out by TMU GEM specialists within short.
- In the early 1980s, the high-voltage equipment insilicon-converting substations was installed, and the Aluminum Plant pot rooms were commissioned by TMU GEM.
- In 1986, TID GEM started works at the Rogun HPP.

TGEM CURRENT HISTORY MILESTONES
- 2006 – The company won its first global tender: Reconstruction of the Perepadnaya HPP
- 2009 – First in recent history, company performed the construction works of 220/110/10 kV Buston substation
- 2010 – The company established a plant for the production of concrete, reinforced concrete poles and concrete products for the energy industry in Dushanbe
- 2010 – The company launched the concrete mixing plant at the Rogun HPP
- 2011 – The company started first quarrying works at Rogun HPP
- 2011 – The company established the rock-crashing plant at Rogun HPP
- 2012 – The company first won global tender outside the country in IR Afghanistan
- 2014 – In cooperation with a partner, the company participated in the rehabilitation of 500/220 kV Nurek HPP switchgear
- 2015 – First time in curren thistory company installed the 500/220 kV cables
- 2016 – The company implemented the supervisory control and SCADA data collection equipment installation project
- 2016 – The company was awarded with the Vakhsh River damming contract under the Rogun HPP construction project
- 2017 – The company received the Quality Management System Certificate of Conformity ISO 9001:2008
- 2017 – The company completed the Rogun HPP dam embankment works to the level of 1050 m
- 2017 – The company first time installed the 500/220 kV GIS
- 2017 – The company completed the reinforcement and concreting works of the Rogun HPP construction tunnels ST1, ST 2
- 2017 – The company implemented the ACEMS (Automated commercial electricity metering system) project in Khujand
- 2018 – For the first time in current history, the company carried out the installation of generator voltage conductors
- 2018 – For the first time in history of its own, company performed the tunneling work
- 2018 – On November 16, the ceremoni energizing of the Rogun HPP 6th unit took place with the participation of our company’s specialists
- 2019 – The company received the Quality Management System Certificate of Conformity OHSAS 18001:2015 and ISO14001:2015
- 2019 – First time in its own history the company implemented the road construction project
- 2019 – The company signed the contract for the "Rehabilitation of the Kairakkum HPP" project
- 2019 – The company signed the contract for the construction of a 500 kV TL as part of CASA-1000 project
- 2019 – On September 9, company specialists participated at the ceremonial energizing of Rogun HPP 5th unit
- 2020 – The company launched the construction of electrical equipment manufacturing plant
- 2020 – The company signed the contract for the construction of a converter substation as part of CASA-1000 project
- 2020 – The company won the tender for the "Rehabilitation of the Nurek HPP" project
- 2020 – The company won the tender for the “Water Resources Management in the Pyanj River Basin” project
- 2021 – The company signed the contract for the design, supply and installation of electrical equipment underthe “Reconnection to the Central Asia Power System” project.
- 2021 – The company won the tender for the construction of right-bank facilities (Lot 3) as part of the Rogun HPP construction project