Regional Power Transmission Project Tajikistan

Regional Power Transmission Project Tajikistan

TGEM won an ADB Grant for a regional power transmission project in Sughd region of the Republic of Tajikistan in 2015. The project scope covered the supply, installation and construction of 220 kV transmission line “Rumi-Geran, Khujand- Kairakkum and Kairakkum-Asht” with a total length of 217,000m.

Work performed:

  • Engineering design
  • Supply and installation of 220 kV steel towers
  • Installation of conductors and OPFW

Project implementation period:

2015-2016