Rehabilitation of Nurek HPP

Rehabilitation of Nurek HPP

Dam Safety P2.1 - Research and Monitoring

Rotary drilling, collection of disturbed and undisturbed soil and rock samples, video filming and laboratory testing, as well as groundwater level measurements during the drilling process.

Drilling / cleanup of existing wells, video filming of all wells and installation of instrumentation (piezometers and inclinometers).


P4 - outdoor switchgear

  • Supply and installation of 6 autotransformers 525/242/10 kV, 200/200/25 MVA,
  • Installation of switchgear 6 kV
  • Installation of 6 circuit breakers 500 kV
  • Auxiliary equipment 500 kV
  • Installation and installation of surge arresters, insulators and connecting equipment