SCADA project

SCADA project

TGEM, in cooperation with a partner, implemented SCADA dispatch control and data collection equipment installation project, manufactured by GE Grid Solutions, which was put into operation at the National Control Center (NCC) "Barqi Tojik".

The SCADA software package allows for round-the-clock monitoring of the operation of all substations with a voltage level up to 500 kV, as well as control overall high-voltage overhead power lines, the total length of which is almost 2,500 km, and 18 overhead lines connecting the energy system of Tajikistan with neighboring countries.