250 MW Asht Solar Photovoltaic Power Plant
The power plant will be located on
an area of 793 hectares. The project is aimed at increasing local
electricity generation in the northern part of the country, improving the
reliability of the region’s power supply, and reducing the load on
interregional transmission lines.
As part of the project, the
necessary energy infrastructure will be developed to connect the new generation
capacity to the country’s unified power system. This will include the
construction of a 9.8 km double-circuit 220 kV overhead transmission line,
which will connect the solar power plant to the Asht 220/110/6 kV substation.
A total of 36 transmission towers will be installed along the route.
The project contractors are TGEM,
working in consortium with a Chinese company.
Once commissioned, the power plant
will significantly increase electricity generation in the Sughd Region and
improve the reliability and resilience of the regional power supply. The new
generation capacity will also help reduce electricity losses associated with
long-distance power transmission.
The project will have significant
economic and social importance. Its implementation will contribute to the
development of modern energy infrastructure, the introduction of new
technologies, the professional development of specialists, and the creation of
additional jobs.
Following completion of construction
and commissioning of the facility, 40 permanent jobs are planned to be
created for local specialists.
The implementation of the Asht Solar
Photovoltaic Power Plant will mark an important stage in the development of
solar energy in Tajikistan and the further expansion of renewable energy use
across the country.
Key Project
Parameters
- Capacity: 250 MW
- Location: Asht District, Sughd Region
- Project area: 793 ha
- Transmission line voltage: 220 kV
- Overhead transmission line length: 9.8 km
- Number of transmission towers: 36

Аштская фотоэлектрическая электростанция